Contact

Institute of Electricity Economics and Energy Innovation

Inffeldgasse 18
8010 Graz
AUSTRIA

Phone: +43 (0) 316 873 - 7901
Email: IEEnoSpam@TUGraz.at
Web: www.IEE.TUGraz.at

LinkedIn
Instagram

VAT No.: ATU 574 77 929

To top


Map

Campus map

Click on the image to enlarge

By public transport

We recommend using public transport to travel to the Symposium on Energy Innovation. For detailed information, please consult the schedules of Graz Linien and the Austrian Federal Railways (ÖBB).
 

Public transport network map of Zone 101 (click on the image to enlarge)

Tram

Please take tram line 6 or 16 (direction St. Peter) and get off at the stop Schulzentrum St. Peter. Once you arrive at Schulzentrum St. Peter, turn into Inffeldgasse and walk about 450m. The main entrance to Inffeldgasse 18 will be on your right-hand side.

Bus

The following bus lines stop at Schulzentrum St. Peter:

  • Linie 63 (Hauptbahnhof - Schulzentrum St. Peter)
  • Linie 64 (St.Leonhard/Kli­ni­kum Mitte – Pun­ti­gam)
  • Linie 66 (Grot­ten­hof­straße – Schul­zen­trum St. Pe­ter)
  • Linie 68 (Lustbühel - Schulzentrum St. Peter)
  • Linie 72 (Liebenau Murpark - Schulzentrum St. Peter)

Once you arrive at Schulzentrum St. Peter, turn into Inffeldgasse and walk about 450m. The main entrance to Inffeldgasse 18 will be on your right-hand side.

Suburban train (S-Bahn)

If you are traveling by S-Bahn S1, S3, S5, S6, S7, or S61, please get off at Graz Main Station (Hauptbahnhof). Then follow the instructions under "From Graz Main Station".


By Car

Due to the high number of participants, parking directly on the premises is not possible. We strongly recommend using public transport for direct travel to the event venue in Graz.

A list of Park + Ride locations can be found at the following link: P + R Locations.

For travel from your chosen parking location to Inffeldgasse 18, please refer to the Graz Linien timetable information. (Please enter "Inffeldgasse 18" as your destination address.)

To top

By Taxi

If you need a taxi, you can order one using the following phone numbers:

From Graz Main Station

If you are arriving from Graz Main Station, please take tram line 6 or 16 (direction St. Peter) and ride to the stop Schulzentrum St. Peter. Once there, turn right into the street in front of you and walk about 450m along Inffeldgasse. The main entrance to Inffeldgasse 18 will be on your right-hand side, where you will find us on the 2nd floor.

To top


From Graz Airport

If you are arriving from Graz Airport Thalerhof, we recommend taking a taxi. The fare is around €20 and the ride takes about 25 minutes. With prior registration, you can be issued a permit to drive directly to Inffeldgasse 18 and get off there. Otherwise, please exit at the corner of Petersgasse and Inffeldgasse (Schulzentrum St. Peter) and walk about 450m along Inffeldgasse. The main entrance to Inffeldgasse 18 will be on your right-hand side, where you will find us on the 2nd floor.

To top

Compensating air travel / Offsetting flights

Flights cause climate-damaging gases. With Climate Austria, the CO2 emissions of your flight can easily be calculated online and compensated for with a voluntary contribution. After completing the CO2 calculation, you have the option to adjust your payment via the input field "CHOOSE ANOTHER AMOUNT" and compensate for additional emissions.

Calculate and compensate CO2 emissions from flights

Travel to the 1st evening event (Alte Universität)

Address

Old University of Graz
Hofgasse 14
8010 Graz
www.alte-universitaet.at

Arrival by bus shuttle service

Arrival to the first evening event at the centrally located “Old University of Graz” is provided via a free bus shuttle service directly from the conference venue (next to the building at Inffeldgasse 18).

Alternative travel options

Alternatively, arrival is possible by taxi, private car, or public transport (stop: Schauspielhaus). On foot, the Old University of Graz can be reached within 5 minutes from the main square (via Sporgasse) or from Geidorfplatz (via Paulustorgasse).

Arrival by Line 6

Duration: 20–25 min (Line 6 to Hauptplatz 10–15 min, on foot 5–10 min from Hauptplatz to the castle)

  • Board Line 6 at St. Peter – Schulzentrum
  • Alight at Hauptplatz (or walk from Jakominiplatz to Hauptplatz)
  • Walk uphill along Sporgasse
  • Turn right into Hofgasse and continue straight towards Burgtor
  • On the right-hand side (Hofgasse 14) is the entrance to the Aula of the Old University

Arrival by Line 6 and Bus 30

Duration: 15–20 min (Line 6 to Jakominiplatz 10–15 min, Bus 30 to Schauspielhaus approx. 5 min)

  • Board Line 6 at St. Peter – Schulzentrum
  • Change at Jakominiplatz to Bus 30 (direction Geidorf)
  • Alight at the fourth stop “Schauspielhaus”

Arrival by car

Duration: approx. 15 min (depending on traffic conditions)

  • Drive by car towards the city center
  • From Inffeldgasse, turn left into Petersgasse
  • Continue straight ahead
  • Petersgasse – Mandellstrasse – Friedrich-Allee – up Burggasse
  • Turn left into Hofgasse
  • Pass the Schauspielhaus on the right
  • Parking available at Karmeliterplatz: Pfauengarten underground garage
Contact
image/svg+xml

Assoc.Prof. Udo Bachhiesl

Institute of Electricity Economics and Energy Innovation
Inffeldgasse 18
8010 Graz, Austria

Tel.: +43 316 873 7903

bachhieslnoSpam@TUGraz.at
www.IEE.TUGraz.at

The event meets the criteria of the Austrian Ecolabel for Green Meetings.